Portfolio.

MAP & PROJECT LIST // 39 PROJECTS

All Projects.

Tap a pin on the map for capacity, role and a photo; zoom in to reveal site boundaries and turbine locations. Below it: the split by company and technology, and the project list.

Loading map…

BY COMPANY // CAPACITY

BY TECHNOLOGY // NUMBER OF PROJECTS

Click a bar to filter the list below. Hybrid projects (Erciyes, Birkapılı and the BESS-integrated wind plants) are counted under each of their technologies.

39 PROJECTS // 3,881 MW

ENGINEERING PORTFOLIO // 2013 — 2026

Portfolio & Projects.

From greenfield development and permitting to M&A due diligence and site execution: selected work and the full portfolio.

YEKA RES-2 // PORTFOLIO

YEKA RES-2 Portfolio

15 projects, 1,308 MW.

In the 30 May 2019 YEKA RES-2 tender, 250 MW of connection capacity in each of the Aydın, Çanakkale, Balıkesir and Muğla regions. In Aydın and Çanakkale: greenfield development that began about ten months before the tender, the YEKA agreement, pre-licensing and generation licences. In Balıkesir and Muğla: technical and development due diligence ahead of the takeover, then governmental permitting through to Ministry acceptance.

CONNECTION REGIONS
  • Aydın

    378 MW · 5

  • Balıkesir

    252 MW · 1

  • Çanakkale

    333 MW · 5

  • Muğla

    344 MW · 4

PROJECTS

15

CAPACITY

1,308 MW

See All Projects
YEKA RES-2024 // PORTFOLIO

YEKA RES-2024 Portfolio

2 projects, 763 MW.

R24 Balkaya (Kırklareli) and R24 Edirne WPP, won as the two largest-capacity projects in the 28 January 2025 YEKA RES-2024 competition (1,200 MW): greenfield development, tender preparation and governmental permitting.

  • R24 Balkaya WPP350.0 MW · Kırklareli
  • R24 Edirne WPP413.0 MW · Edirne
BESS-INTEGRATED WPP // PORTFOLIO

BESS-Integrated WPP Portfolio

3 projects, 662 MW, 500 MWh.

Battery storage integrated with wind farms: greenfield development and governmental permitting for the 19 Mayıs, İzmit and Malkara WPP + BESS projects.

  • 19 Mayıs WPP + BESS251.6 MW · 180 MWh · Samsun
  • İzmit WPP + BESS205.0 MW · 120 MWh · Edirne
  • Malkara WPP + BESS205.4 MW · 200 MWh · Tekirdağ
WIND + SOLAR HYBRID

Erciyes WPP + solar

A hybrid plant delivered in two phases.

At the plant won in a TEİAŞ wind tender: permitting for the existing 12 turbines, then a 4-turbine capacity increase and the development and site execution of the 25 MWp solar component.

115.8 MW
CAPACITY

115.8 MW

TURBINES

16

PERIOD

2017–2022

Greenfield developmentBrownfield developmentConstruction / site execution
YEKA RES-2 // EXECUTION

Armutçuk WPP + Ihlamur WPP

Two projects, from permits to handover.

84 MW Armutçuk and 75.6 MW Ihlamur WPP: permitting and site execution on two YEKA RES-2 projects, plus greenfield development and the generation licence at Armutçuk, both through to handover.

159.6 MW
CAPACITY

159.6 MW

TURBINES

38

PERIOD

2019–2026

Greenfield developmentBrownfield developmentConstruction / site execution
RES GROUP // PERMITTING

Evrencik WPP

120 MW of wind, one focus: permits.

At RES Group: leading governmental permitting and stakeholder coordination for the 120 MW Evrencik wind plant.

120.0 MW
CAPACITY

120.0 MW

TURBINES

24

PERIOD

2016–2017

Greenfield developmentBrownfield development
PROTOTYPE // R&D

Bandırma CCGT Prototype

A 6 MW prototype developed as an R&D project.

Developed as an R&D project under Article 60 of the Electricity Market Licensing Regulation: greenfield development, permitting and the R&D certificate, then the balance-of-plant and turbine supply and installation contracts.

6.0 MW
CAPACITY

6.0 MW

TURBINES

1

PERIOD

2021–2024

Greenfield developmentBrownfield development